When installing the communication tower bionic tree, you need to follow a certain installation method. The main installation methods are:


Communication tower bionic tree is being installed

1. In the tower assembly, brutal construction is not allowed, the main material is not allowed to be used as a pole, and the bolt perforation is not allowed to be hit with a sledgehammer. The reason should be found out if the assembly is difficult, and forced assembly is strictly prohibited.

2. The assembly of each tower member should be firm, and if there is a gap at the intersection, gaskets of corresponding thickness should be installed;

3. The bolt should be perpendicular to the surface of the rod, and there should be no gap between the screw head and the rod. After the nut is tightened, the length of the single nut screw exposed to the nut is not less than 2 pitches, and the double female should be flat with the screw; bolt thread is not allowed Into the shear plane;

4. Bolt penetration direction should meet the following requirements: horizontal direction from inside to outside, vertical direction from bottom to top;

After the tower is assembled, all bolts must be tightened again, and must be tightened one by one after half a year of operation.

5. The floor-to-ceiling bionic tree beautification tower chooses different anchor bolt models according to the tower height, which is particularly important here.